cabecera-case-studies-puertollano
  • Puertollano

Controlled demolition in the puertollano thermoelectric power plant: further success for MAXAM

MAXAM was the company in charge of the design and execution of the blasting for the demolition of the Puertollano thermoelectric plant’s concrete towers. Part of the success of the operation is the result of our experience and knowledge acquired after more than 100 demolitions in the world.

Where did it take place

Spain

Project Timeline

The ELCOGAS thermoelectric plant, which produced electrical energy with integrated gasification combined cycle technology, ceased its activity in 2016. MAXAM was in charge of the complex demolition of the two concrete towers that was carried out with the detonation of 275 kilograms of explosives in just 3,285 milliseconds.

  • Key figures

  • WHERE ?
    Puertollano, Spain
  • CUSTOMER
    RECIFEMETAL and ELCOGAS
  • Safety perimeter
    1.2 kilometers
  • Boreholes
    892
  • EXPLOSIVE USED
    275 kilograms of RIODIN dynamite
  • DETONATORS
    +more than 1000 RIOTRONIC DT electronic detonators
  • TOTAL SEQUENCE
    3,285 milliseconds

After the demolition, both towers fell in the planned direction and the seismographs reflected much lower vibration results.

Facts & figures

/Images/Maxam/CaseStudie/PanamaCanalVideo